build day 3 and 4.
Why have we been told this build will take 4 weeks here are pictures from the evenings of day 3 and 4 of the build of the sunroom. So on day three the whole floor base was laid and leveled.
Then they took a break over the weekend and came back today and built up the walls.
But alas they ran into a problem, over the weekend we realised that the floor base is too high, we had asked for it to be the same level as the concrete base of the house but they leveled it the level of our floor, so a bit of kangoing and releveling will be happening tomorrow.
Monday, June 9th, 2008